
Hand Grind Edges. Grind first, if needed, to remove previous existing coating. |
|
|
|
First step: Acid wash floor |
|
|
|
Floor machine to profile floor |
|
|
|
Ammonia wash and powerwash floor |
|
|
|
Let floor dry out and repair cracks and damaged areas as needed. |
|
|
|
Floor to block caulked and coated. All seams caulked. |
|
|
|
Grind patched areas by hand. |
|
|
|
On very damaged floors, squeegee patch over initial floor areas. |
|
|
|
Prime coat applied to floor. |
|
|
|
All stem walls are painted, and top coat applied. |
|
|
|
Apply chips. |
|
|
|
Apply two coats of UV protectant clear coat with anti-slip additive. |
|
|
|
End Product. |
|
|
|